Sports Equipment

RHL-install-pingree-gymnasium-thumb

Pingree School Field House – Hamilton, MA

The Robert H. Lord Company provided a complete Gymnasium Equipment Package at The Pingree School Field House in Hamilton, MA.  The scope of work included Porter Athletic Custom Basketball Backstops, Center Roll Divider Curtains, Wall Pads and Competition Grade Volleyball Systems.  

rhl-uxbridge-thumb

Uxbridge High School – Uxbridge, MA

The installation at Uxbridge High School included, Porter Athletic wall pads with custom logos, 12 Sico President tables (12 foot long café tables with 12 attached stools), auditorium seats (not pictured) and various sized Smith System Planner tables (not pictured).

rhl-grafton-high-school-thumb

Grafton High School – Grafton, MA

The installation that took place at Grafton High School was mainly athletic related. A mix between outdoor Porter Athletic Equipment and Gill Field Equipment which included football, soccer and lacrosse goals, a long jump pit, and a Daktronics Scoreboard for the football field outside, along with Hussey Bleachers in the gymnasium. In the auditorium, 665… Read more »

wheeler clinic

Wheeler Clinic NW Village School

Plainville,  CT Updates to the Wheeler Clinic NW Village School gymnasium included 2 Porter 917 motorized backstops with stage and wall padding.